Balancing Biofuels and Food Security – Uganda
Project Description NOVI Energy was selected to provide Technical Assistance to define and develop a biofuels strategy by the Ministry of Energy and Mineral Development (MEMD) for the Republic of…
Project Description NOVI Energy was selected to provide Technical Assistance to define and develop a biofuels strategy by the Ministry of Energy and Mineral Development (MEMD) for the Republic of…
Project Description Sponsored by the United States Trade and Development Agency, NOVI Energy worked with the Ministry of Mining and Energy in the Republic of Serbia to evaluate the feasibility…
NOVI completed an energy audit to identify energy cost savings opportunities at city properties. NOVI evaluated the technical and financial feasibility of a natural gas fired Combined Heat and Power…
Project Info The Fremont Community Digester (FCD) plant is a complete mix anaerobic digester that receives 100,000 tons per year of organic wastes and converts it into biogas that is…
NOVI evaluated the technical and financial feasibility of installing and operating a biodiesel production facility in the City of Detroit with locally available feedstock.
NOVI evaluated the technical and financial feasibility of constructing and operating a community anaerobic digester in Crawford County, Iowa that would utilize locally available organic wastes to produce biogas and…
NOVI verified for Huron County’s Economic Development department the technical and financial feasibility of building a community anaerobic digester in Huron County, Michigan that would utilize locally available organic wastes…
NOVI evaluated the technical and financial feasibility of 100 MW and a 50 MW wood fired power generating facilities in Halifax County, Virginia utilizing residual biomass from the region’s forest products…
NOVI evaluated the technical and financial feasibility of installing and operating a biogas generation facility co-located with an ethanol production plant at Watervliet, Michigan and presented the results in a…
The 49.9 MW Halifax County Biomass (HCB) power plant is located in South Boston, Virginia. Construction of the approximately $180 million waste-wood fueled power plant was completed in the fourth…